This project involved:
- Demolition of the existing installation.
- New installation of light & power.
- New air conditioning feeds to the isolators, integration of the air conditioning control via remote sensors.
- New site main switch board along with 6 x tenancy sub-boards.
- Communication/Data/Phone with 20-year warranty.
- Intruder security with light and air conditioning shut down facility along with smoke detection integrated into the security system.